Chengdu Second Ring Road is an elevated highway in the southwest of China. Built and opened to traffic in May 2013, it is the only hyper channel in the city, with no traffic lights, transporting more than 200,000 people every day, which greatly alleviates…
21 Oct,2021The integration of construction drawing design and BIM model in the management system of highway construction can perform the functions of BIM model view, design data management and view, management of site operation, site inspection, design alteration, s…
31 Aug,2021YREC participated in the construction of the Narin Gol River Hydro-junction with its BIM+GIS platform integrating design and building on the basis of SuperMap GIS technology.
20 Aug,2021Building Information Modeling (BIM for short) can be combined with GIS technology. We can use GIS software to read BIM data.
18 Aug,2021Aiming at the characteristics of large investment scale, short construction period, and difficult terrain in construction projects, a set of project management platforms based on GIS + BIM technology were developed.
18 Feb,2020The Pearl River Delta Water Resources Allocation Project includes a main line, two secondary lines, a branch line, a regulating reservoir, and three lift pumping stations. The total length of the water conveyance line is 113.1km, which is the largest wate…
07 Jan,2020The cross-sea tunnel project is the first super-cross-sea project in China to pass through a karst-developed area with a large diameter.
04 Dec,2019Based on SuperMap 9D, the BIM construction management platform was developed, it can support the models of mainstream modeling software such as revit, bentley and catia by means of the powerful BIM 3D engine.
30 Sept,2019